{"id":63842,"date":"2010-11-19T09:33:31","date_gmt":"2010-11-19T13:33:31","guid":{"rendered":"tag:www.nasa.gov:\/\/39b1f3c991f3a8b315dc67940b585678"},"modified":"2010-11-19T09:33:31","modified_gmt":"2010-11-19T13:33:31","slug":"doublers-installed-on-tank-stringers","status":"publish","type":"post","link":"https:\/\/spaceweekly.com\/?p=63842","title":{"rendered":"&#8216;Doublers&#8217; Installed on Tank Stringers"},"content":{"rendered":"<p>Technicians at NASA&#8217;s Kennedy Space Center in Florida installed new sections of metal, called &quot;doublers&quot; because they are twice as thick as the original stringer metal, to replace the two cracked stringers on space shuttle Discovery&#8217;s external fuel tank. Caps at the end of the stringers will be installed this morning. Primer application for the replacement foam insulation also will begin this morning. <\/p>\n<p>At yesterday\u2019s Program Requirements Control Board, or PRCB, the Space Shuttle Program clearly identified the analysis and repairs that are required to safely launch shuttle Discovery on its STS-133 mission. This analysis will be reviewed at a special PRCB on Wednesday, Nov. 24. Pending a successful review of the flight rationale at that meeting, a Launch Status Briefing would be held with senior NASA management on Monday, Nov. 29. <\/p>\n<p>The Launch Status Briefing and news conference planned for Monday, Nov. 22 are cancelled. The Kennedy Space Center \u201cCall-to-Stations\u201d to begin the launch countdown will be no earlier than Nov. 30, supporting a first launch attempt no earlier than Dec. 3 at about 2:52 a.m. EST.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Technicians at NASA&#8217;s Kennedy Space Center in Florida installed new sections of metal, called &quot;doublers&quot; because they are twice as thick as the original stringer metal, to replace the two cracked stringers on space shuttle Discovery&#8217;s external fuel tank. Caps at the end of the stringers will be installed this morning. Primer application for the replacement foam insulation also will begin this morning. <\/p>\n<p>At yesterday\u2019s Program Requirements Control Board, or PRCB, the Space Shuttle Program clearly identified the analysis and repairs that are required to safely launch shuttle Discovery on its STS-133 mission. This analysis will be reviewed at a special PRCB on Wednesday, Nov. 24. Pending a successful review of the flight rationale at that meeting, a Launch Status Briefing would be held with senior NASA management on Monday, Nov. 29. <\/p>\n<p>The Launch Status Briefing and news conference planned for Monday, Nov. 22 are cancelled. The Kennedy Space Center \u201cCall-to-Stations\u201d to begin the launch countdown will be no earlier than Nov. 30, supporting a first launch attempt no earlier than Dec. 3 at about 2:52 a.m. EST.<\/p>\n","protected":false},"author":26,"featured_media":612598,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[],"class_list":["post-63842","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-shuttle-update"],"_links":{"self":[{"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/posts\/63842","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=63842"}],"version-history":[{"count":1,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/posts\/63842\/revisions"}],"predecessor-version":[{"id":63878,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/posts\/63842\/revisions\/63878"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/media\/612598"}],"wp:attachment":[{"href":"https:\/\/spaceweekly.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=63842"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=63842"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=63842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}