{"id":779799,"date":"2024-03-28T15:31:50","date_gmt":"2024-03-28T20:31:50","guid":{"rendered":"http:\/\/spaceweekly.com\/?p=779799"},"modified":"2024-03-28T15:31:50","modified_gmt":"2024-03-28T20:31:50","slug":"nasa-selects-construction-management-services-acquisition-contractor","status":"publish","type":"post","link":"https:\/\/spaceweekly.com\/?p=779799","title":{"rendered":"NASA Selects Construction Management Services Acquisition Contractor"},"content":{"rendered":"<p> <br \/>\n<\/p>\n<div>\n<p>NASA has selected small business Firelake-Arrowhead NASA Services Joint Venture of Lawrence, Kansas, to acquire construction management, inspection, surveying, and testing services at NASA centers across the country.<\/p>\n<p>The Construction Management, Inspection, Surveying, and Testing (CMIST-II) contract was competed as a Small Business 8(a) set-aside, and the maximum contract value is approximately $38.8 million.<\/p>\n<p>This is a hybrid contract with firm-fixed-price and cost-plus-fixed-fee for base services plus a firm-fixed price indefinite-delivery\/indefinite aspect performed at NASA\u2019s Glenn Research Center at Lewis Field in Cleveland and Neil Armstrong Test Facility in Sandusky, Ohio. It also will have a firm-fixed price indefinite-delivery\/indefinite-quantity aspect, which can be performed at any NASA center.<\/p>\n<p>The performance period begins Monday, April 1, and includes a 30-day phase-in period, a two-year base period, a two-year option, a one-year option, and a six-month option, with the potential to extend services through Nov. 30, 2029.<\/p>\n<p>The contractor will manage construction projects and maintenance tasks from initial concepts through completion, including requirements development, design, construction, commissioning, activation, and turnover. Leidos, Inc., of Reston, Virginia, is a subcontractor.<\/p>\n<p>For information about NASA and other agency programs, visit:<\/p>\n<p class=\"has-text-align-center\"><strong><\/strong><\/p>\n<p class=\"has-text-align-center\">-end-<\/p>\n<p>Cheryl Warner<br \/>Headquarters, Washington<br \/>202-358-1600<br \/>cheryl.m.warner@nasa.gov<\/p>\n<p>Jan Wittry<br \/>Glenn Research Center, Cleveland<br \/>216-433-5466<br \/>jan.m.wittry-1@nasa.gov<\/p>\n<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/www.nasa.gov\/news-release\/nasa-selects-construction-management-services-acquisition-contractor\/?rand=772114\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA has selected small business Firelake-Arrowhead NASA Services Joint Venture of Lawrence, Kansas, to acquire construction management, inspection, surveying, and testing services at NASA centers across the country. The Construction&hellip; <\/p>\n","protected":false},"author":1,"featured_media":775519,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-779799","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-NASA"],"_links":{"self":[{"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/posts\/779799","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=779799"}],"version-history":[{"count":0,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/posts\/779799\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/media\/775519"}],"wp:attachment":[{"href":"https:\/\/spaceweekly.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=779799"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=779799"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=779799"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}