{"id":803762,"date":"2026-09-23T07:25:32","date_gmt":"2026-09-23T12:25:32","guid":{"rendered":"https:\/\/spaceweekly.com\/?p=803762"},"modified":"2026-09-23T07:25:32","modified_gmt":"2026-09-23T12:25:32","slug":"first-switch-on-for-esa-jaxa-ramses-asteroid-mission","status":"publish","type":"post","link":"https:\/\/spaceweekly.com\/?p=803762","title":{"rendered":"First switch on for ESA-JAXA Ramses asteroid mission"},"content":{"rendered":"<p> <br \/>\n<\/p>\n<div id=\"\">\n<header class=\"entry article__block\">\n\t<span class=\"pillar article__item\">Space Safety<\/span><\/p>\n<p>\t\t\t\t\t\t<span>23\/09\/2026<\/span><br \/>\n\t\t\t\t<span><span id=\"viewcount\">51<\/span><small> views<\/small><\/span><br \/>\n\t\t\t\t\t\t\t\t\t\t<span><span id=\"ezsr_total_27537267\">1<\/span><small> likes<\/small><\/span><\/p>\n<\/header>\n<div class=\"abstract article__block article__item\">\n<p>The European Space Agency\u2019s and Japan Aerospace Exploration Agency\u2019s Ramses planetary defence spacecraft has been turned on for the first time by its prime contractor \u2013 marking a major milestone in its time-critical development schedule.<\/p>\n<\/div>\n<div class=\"article__block\">\n<figure class=\"article__image article__image--right\"><figcaption class=\"image__caption\">\n\t\t\t\t\t\t\tESA&#8217;s Ramses mission at the asteroid Apophis<br \/>\n\t\t\t\t\t\t\t\t<\/figcaption><\/figure>\n<p>Ramses must reach space by spring 2028 in order to rendezvous with the cruise-liner-sized Apophis asteroid as it passes Earth on Friday 13 April 2029, representing less than three and a half years from contract signing to lift-off.<\/p>\n<p>The spacecraft\u2019s Core Module, containing all its main electronics, is currently being assembled in the Milan cleanroom facility of OHB Italia. Key Ramses units have been mounted within the module\u2019s U-shaped body, and then linked together via intricate cabling, known as the spacecraft harness.<\/p>\n<p>\u201cFor the first time we were able to apply power to Ramses\u2019s On-Board Computer together with its integrated subsystems inside the spacecraft body,\u201d explains Ramses lead engineer Ingo Gerth.<\/p>\n<\/p><\/div>\n<div class=\"article__block\">\n<figure class=\"article__image article__image--left\"><figcaption class=\"image__caption\">\n\t\t\t\t\t\t\tThe moment of Ramses switch-on<br \/>\n\t\t\t\t\t\t\t\t<\/figcaption><\/figure>\n<p>\u201cObviously these units have previously undergone individual testing, but this was by themselves in a void. Now, for the first time we have been able to perform real integrated functional testing, working in unison with other equipment on the satellite. We can now send commands via the computer to each subsystem to verify their performance.\u201d<\/p>\n<p>Along, with the On-Board Computer, these integrated subsystems include the mission\u2019s Mass Memory Unit for data storage, the Power Conditioning and Distribution Unit \u2013 delivering power throughout the spacecraft \u2013 and multiple Remote Terminal Units, converting outputs from instruments into digital data for the computer.<\/p>\n<p>The installation of the units and connecting harness was performed by specialist OHB Italia teams, working hard to maintain the rigorous Ramses mission schedule.<\/p>\n<\/p><\/div>\n<div class=\"article__block\">\n<figure class=\"article__image article__image--right\"><figcaption class=\"image__caption\">\n\t\t\t\t\t\t\tAsteroid Apophis passes Earth on Friday 13 April 2029<br \/>\n\t\t\t\t\t\t\t\t<\/figcaption><\/figure>\n<p>Ramses functional architect Arnaud Bourdoux comments: \u201cThis first spacecraft switch on was a very exciting moment for us all, because these are the same system-critical units we will be turning on when Ramses is there on its launch pad, to start its actual journey into space.\u201d<\/p>\n<p>Guiseppe Filomeno, Ramses project manager at OHB Italia, adds: \u201cThis first integrated switch-on marks an important milestone for Ramses, as the spacecraft begins to come to life at our facilities in Milan. Powering up the onboard computer and establishing communication between the connected units provides the first tangible confirmation that the integrated systems are working together as intended.\u201d<\/p>\n<p>ESA\u2019s Ramses project manager Paolo Martino explains: \u201cThis moment really marks a completely new phase for the project; everything beforehand was just paper calculations, simulations or unit tests, but now we have an actual spacecraft, ready for our full-scale integrated system testing to begin.\u201d<\/p>\n<\/p><\/div>\n<div class=\"article__block\">\n<figure class=\"article__image article__image--left\"><figcaption class=\"image__caption\">\n\t\t\t\t\t\t\tRamses Core Module<br \/>\n\t\t\t\t\t\t\t\t<\/figcaption><\/figure>\n<p>To save further schedule time, Ramses is being assembled in two parts at once. The Core Module in Italy is being built around a dummy version of the spacecraft\u2019s central cylindrical core.<\/p>\n<p>Meanwhile the spacecraft\u2019s Propulsion Module \u2013 including its actual carbon-fibre reinforced-polymer core \u2013 is currently being dressed with propellant tanks, associated sensors, actuators, and linking harness at ArianeGroup\u2019s Orbital Propulsion Centre\u00a0in Lampoldshausen, Germany.<\/p>\n<p>The two modules will be mated together next spring at ESA\u2019s ESTEC Test Centre\u00a0in Noordwijk, the Netherlands, which will mark the start of its pre-flight testing phase.<\/p>\n<\/p><\/div>\n<div class=\"article__block\">\n<figure class=\"article__image article__image--right\"><figcaption class=\"image__caption\">\n\t\t\t\t\t\t\tJapan&#8217;s contributions to Ramses<br \/>\n\t\t\t\t\t\t\t\t<\/figcaption><\/figure>\n<p>\u201cThe testing will reproduce all the conditions Ramses will go through during its launch and operations in space,\u201d notes Franco Perez Lissi, system engineer for Ramses at ESA.<\/p>\n<p>\u201cAmong the most challenging will be its thermal vacuum test, where the complete spacecraft will be placed in space-quality vacuum for two to three weeks and operated on a continuous basis. Equally difficult will be its mission simulation test involving Ramses going through a sped-up simulation of everything from lift-off to its end of mission.\u201d<\/p>\n<p>The ESA-JAXA Ramses mission \u2013 and its two accompanying CubeSats \u2013 must be ready to be launched on a Japanese H-3 rocket in spring 2028.<\/p>\n<\/p><\/div>\n<div class=\"article__block\">\n<div class=\"article__video\">\n<div class=\"video__caption\">\n\t\t\tRamses: ESA\u2019s mission to rendezvous with asteroid Apophis<br \/>\n\t\t\t\n\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"share button-group article__block article__item\">\n<p><button id=\"ezsr_27537267_2_5\" class=\"btn ezsr-star-rating-enabled\" title=\"Like\">Like<\/button><\/p>\n<p id=\"ezsr_just_rated_27537267\" class=\"ezsr-just-rated hide\">Thank you for liking<\/p>\n<p id=\"ezsr_has_rated_27537267\" class=\"ezsr-has-rated hide\">You have already liked this page, you can only like it once!<\/p>\n<\/div>\n<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/www.esa.int\/Space_Safety\/Planetary_Defence\/First_switch_on_for_ESA-JAXA_Ramses_asteroid_mission?rand=771654\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Space Safety 23\/09\/2026 51 views 1 likes The European Space Agency\u2019s and Japan Aerospace Exploration Agency\u2019s Ramses planetary defence spacecraft has been turned on for the first time by its&hellip; <\/p>\n","protected":false},"author":1,"featured_media":803763,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-803762","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ESA"],"_links":{"self":[{"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/posts\/803762","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=803762"}],"version-history":[{"count":0,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/posts\/803762\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=\/wp\/v2\/media\/803763"}],"wp:attachment":[{"href":"https:\/\/spaceweekly.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=803762"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=803762"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/spaceweekly.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=803762"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}