ISS Daily Summary Report – 11/23/2020

Payloads Drop Vibration: The crew set up the appropriate support hardware, dispensed the large water drops,…

ISS Daily Summary Report – 11/20/2020

Payloads Airborne Particulate Monitor (APM) Install: The crew inspected the APM unit for debris, installed it…

ISS Daily Summary Report – 11/19/2020

Payloads Avatar-X: In support of the Avatar-X experiment, the crew set up the video camera, opened…

ISS Daily Summary Report – 11/18/2020

Russian Segment (RS) Extravehicular Activity (EVA) #47: Today, CDR Sergey Ryzhikov (EV1) and FE-5 Sergey Kud-Sverchkov…

ISS Daily Summary Report – 11/17/2020

SpaceX Crew-1 Docking: Resilience successfully docked to the ISS on November 16th at 10:02 PM CT,…

ISS Daily Summary Report – 11/16/2020

Payloads Cell Biology Experiment Facility-L (CBEF-L) Current Measurement Preparation: The crew set up the Saibo rack…

NASA’s SpaceX Crew-1 Astronauts Headed to International Space Station

An international crew of astronauts is en route to the International Space Station following a successful…

ISS Daily Summary Report – 11/13/2020

Payloads Phospho-aging: The crew performed Urine and blood Collection setups in support of the Phospho-aging and…

ISS Daily Summary Report – 11/12/2020

Payloads GRIP: The crew performed an external Hard drive installation to the SSC-6 laptop in preparation…

ISS Daily Summary Report – 11/11/2020

Payloads Standard Measures: The crew performed Flight Day 30 Saliva collections. The aim of the investigation…