ISS Daily Summary Report – 11/06/2017

MBSU transfer and installation:  On Friday, ground controllers attempted to transfer the recently repaired spare Main Bus Switching Unit (MBSU) through the Japanese Experiment Module (JEM) Airlock (A/L) and install it on its stowage location on External Stowage Platform 2 (ESP2).  The JEM A/L outer door opened as commanded, but the slide table did not … Continue reading “ISS Daily Summary Report – 11/06/2017”