ISS Daily Summary Report – 11/17/2017

NanoRack Cubesat Deployer (NRCSD) #13: Installation: This morning, the JEM A/L inner hatch was opened and the slide table was extended to the JPM side. The crew then installed the NRCSD #13 deployer onto the Multipurpose Experiment Platform (MPEP). The slide table was retracted from the JPM side and the inner hatch was closed.  The … Continue reading “ISS Daily Summary Report – 11/17/2017”