Development of the European Service Module Propulsion Subsystem for the Multi-Purpose Crew Vehicle [STUB]

Abstract: Hardware Heritage Schedule limitations and budget constraints drove the need for extensive use of heritage hardware designs. In some cases (OMS and TVC) flight hardware reuse (from Shuttle) was required,and will be delta-qualified for use on Orion Primary sources of heritage: ATV Shuttle Orion CM PSS Ariane 5 EPS Targeted Development Testing Component development testing was performed to address the highest risk areas of heritage design compliance with Orion requirements Assembly level develo…