ISS Daily Summary Report – 11/02/2021

Payloads: Advanced Combustion via Microgravity Experiments (ACME):  A crewmember replaced the ACME Fiber Arm 1, Pressure Switch 2 with the ACME Pressure Switch Jumper, and replaced the ACME Igniter Tip 2.  This is in preparation of Flame Design part 2 operations.  The ACME project is a set of six independent studies of gaseous flames to …


Click here for original story, ISS Daily Summary Report – 11/02/2021


Source: ISS Report