ISS Daily Summary Report – 12/13/2022

Payloads: Combustion Integrated Rack (CIR): CIR Absorber Cartridge QDs (Quick Disconnects) were reconnected. The CIR includes an optics bench, combustion chamber, fuel and oxidizer control, and five different cameras for performing combustion investigations in microgravity. Dose Distribution Inside the International Space Station-3D (DOSIS-3D): DOSTEL-2 data and power cables were removed from DOSIS Main Box in …


Click here for original story, ISS Daily Summary Report – 12/13/2022


Source: ISS Report