ISS Daily Summary Report – 1/23/2019

Materials ISS Experiment Flight Facility (MISSE-FF) Troubleshooting: Performed as planned ground-commanded troubleshooting, today a file downlink…

ISS Daily Summary Report – 1/22/2019

Fluid Shifts: In support of the final day of Fluid Shifts operations, the crew performed a…

ISS Daily Summary Report – 1/21/2019

FIR/LMM/Biophysics-5 Configuration: While the crew was installing Biophysics-5 plate number 3 into the FIR/LMM (Fluids Integrated…

ISS Daily Summary Report – 1/18/2019

Combustion Integrated Rack (CIR) Hardware Reconfiguration: As a continuation of the ongoing CIR reconfiguration for the…

ISS Daily Summary Report – 1/17/2019

Fluid Shifts: As a continuation of the Fluid Shifts investigation, today the crew performed the baseline…

ISS Daily Summary Report – 1/16/2019

Bio-monitor commissioning: The crew completed the first part of the Bio-Monitor commissioning activity.  The ground team…

ISS Daily Summary Report – 1/15/2019

Electromagnetic Levitator (EML): Today the crew performed a sample chamber swap for the EML facility.  Experiment…

ISS Daily Summary Report – 12/19/2018

55 Soyuz (55S) Undock and Landing: The 55S crew, Sergey Prokopev, Alexander Gerst, and Serena Auñón…

ISS Daily Summary Report – 12/18/2018

Change of Command Ceremony:  Expedition 57 CDR Alexander Gerst handed off station command to Expedition 58…

ISS Daily Summary Report – 12/17/2018

Airway Monitoring: Today the crew performed the setup activities for the upcoming Airway Monitoring US Lab…