ISS Daily Summary Report – 6/20/2017

Bigelow Expandable Activity Module (BEAM):  The crew ingressed BEAM and replaced a 3.3 mm thick Radiation…

ISS Daily Summary Report – 6/19/2017

Roll Out Solar Array (ROSA) External Payload: Over the weekend, Robotic ground controllers maneuvered the Space…

ISS Daily Summary Report – 6/16/2017

67 Progress (67P) Docking: 67P rendezvous and docking to ISS Service Module (SM) aft port was…

ISS Daily Summary Report – 6/15/2017

Neutron Star Interior Composition ExploreR (NICER) Status: Yesterday’s planned NICER deployment was not completed due to …

ISS Daily Summary Report – 6/14/2017

67 Progress Launch: 67P launched successfully from Baikonur, Kazakhstan today at 4:20am CDT followed by a…

ISS Daily Summary Report – 6/13/2017

Electrostatic Levitation Furnace (ELF): The crew replaced the Sample Cartridge and the stuck Sample Holder in…

ISS Daily Summary Report – 6/12/2017

Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis:  On Saturday two crewmembers performed the second…

ISS Daily Summary Report – 6/09/2017

Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis:  Two crewmembers performed the first injection of…

ISS Daily Summary Report – 6/08/2017

NanoRacks Module-70:  The crew removed NanoRacks Module-70 from the Nanoracks Platform-2 in the Japanese Experiment Module…

ISS Daily Summary Report – 6/07/2017

NanoRacks Module-70:  The crew removed NanoRacks Module-70 from a General Laboratory Active Cryogenic ISS Experiment Refrigerator…