Bigelow Expandable Activity Module (BEAM): The crew ingressed BEAM and replaced a 3.3 mm thick Radiation…
Author: HQ
ISS Daily Summary Report – 6/19/2017
Roll Out Solar Array (ROSA) External Payload: Over the weekend, Robotic ground controllers maneuvered the Space…
ISS Daily Summary Report – 6/16/2017
67 Progress (67P) Docking: 67P rendezvous and docking to ISS Service Module (SM) aft port was…
ISS Daily Summary Report – 6/15/2017
Neutron Star Interior Composition ExploreR (NICER) Status: Yesterday’s planned NICER deployment was not completed due to …
ISS Daily Summary Report – 6/14/2017
67 Progress Launch: 67P launched successfully from Baikonur, Kazakhstan today at 4:20am CDT followed by a…
ISS Daily Summary Report – 6/13/2017
Electrostatic Levitation Furnace (ELF): The crew replaced the Sample Cartridge and the stuck Sample Holder in…
ISS Daily Summary Report – 6/12/2017
Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis: On Saturday two crewmembers performed the second…
ISS Daily Summary Report – 6/09/2017
Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis: Two crewmembers performed the first injection of…
ISS Daily Summary Report – 6/08/2017
NanoRacks Module-70: The crew removed NanoRacks Module-70 from the Nanoracks Platform-2 in the Japanese Experiment Module…
ISS Daily Summary Report – 6/07/2017
NanoRacks Module-70: The crew removed NanoRacks Module-70 from a General Laboratory Active Cryogenic ISS Experiment Refrigerator…