ISS Daily Summary Report – 3/01/2017

Lab Carbon Dioxide Removal Assembly (CDRA) Maintenance:  Yesterday the crew removed Lab CDRA from the rack,…

ISS Daily Summary Report – 2/28/2017

Lab Carbon Dioxide Removal Assembly (CDRA) Maintenance: The adsorbent material (Zeolite) inside the CDRA beds breaks…

ISS Daily Summary Report – 2/27/2017

Rodent Research-4 (RR-4) Transfer Operations: Saturday, the crew reported all of the animals were successfully transferred…

ISS Daily Summary Report – 2/24/2017

66 Progress (66P) Docking: The Progress MS-05 (66P) rendezvous and docking to ISS Docking Compartment (DC)-1…

ISS Daily Summary Report – 2/23/2017

66 Progress (66P) Launch: All 66P systems are performing nominally. One rendezvous maneuver, DV3, was performed…

ISS Daily Summary Report – 2/22/2017

66 Progress (66P) Launch: 66P launched successfully from Baikonur, Kazakhstan on Tuesday at 11:23 pm CST…

ISS Daily Summary Report – 2/21/2017

Preparation for Dragon Arrival:  Dragon successfully lifted off on the SpaceX Falcon 9 rocket from Launch…

ISS Daily Summary Report – 2/18/2017

With the delay in SpaceX-10 launch, Monday will be an off duty day for the ISS…

ISS Daily Summary Report – 2/17/2017

NanoRack Cubesat Deployer (NRCSD) #10 Installation: This morning the crew installed two Quad deployers on the…

ISS Daily Summary Report – 2/16/2017

Transition to (X2) R15 Software:  As part of the R15 software transition, the Starboard 1 (S1)…