Lab Carbon Dioxide Removal Assembly (CDRA) Maintenance: Yesterday the crew removed Lab CDRA from the rack,…
Author: HQ
ISS Daily Summary Report – 2/28/2017
Lab Carbon Dioxide Removal Assembly (CDRA) Maintenance: The adsorbent material (Zeolite) inside the CDRA beds breaks…
ISS Daily Summary Report – 2/27/2017
Rodent Research-4 (RR-4) Transfer Operations: Saturday, the crew reported all of the animals were successfully transferred…
ISS Daily Summary Report – 2/24/2017
66 Progress (66P) Docking: The Progress MS-05 (66P) rendezvous and docking to ISS Docking Compartment (DC)-1…
ISS Daily Summary Report – 2/23/2017
66 Progress (66P) Launch: All 66P systems are performing nominally. One rendezvous maneuver, DV3, was performed…
ISS Daily Summary Report – 2/22/2017
66 Progress (66P) Launch: 66P launched successfully from Baikonur, Kazakhstan on Tuesday at 11:23 pm CST…
ISS Daily Summary Report – 2/21/2017
Preparation for Dragon Arrival: Dragon successfully lifted off on the SpaceX Falcon 9 rocket from Launch…
ISS Daily Summary Report – 2/18/2017
With the delay in SpaceX-10 launch, Monday will be an off duty day for the ISS…
ISS Daily Summary Report – 2/17/2017
NanoRack Cubesat Deployer (NRCSD) #10 Installation: This morning the crew installed two Quad deployers on the…
ISS Daily Summary Report – 2/16/2017
Transition to (X2) R15 Software: As part of the R15 software transition, the Starboard 1 (S1)…