ISS Daily Summary Report – 2/15/2017

Transition to (X2) R15 Software:  As part of the R15 software transition, the Payload (PL) Multiplexer/Demultiplexers…

ISS Daily Summary Report – 2/14/2017

Transition to (X2) R15 Software:  As part of the R15 software transition, two of the three…

ISS Daily Summary Report – 2/13/2017

Electrostatic Levitation Furnace (ELF) Sample Clean: This morning the crew disconnected the Sample Cartridges from within…

ISS Daily Summary Report – 2/10/2017

Japanese Experiment Module (JEM) ORU Transfer Interface (JOTI) and Robotics External Leak Locator (RELL) Installation on…

ISS Daily Summary Report – 2/08/2017

Galley Rack Outfitting: Today the crew relocated the Node 1 16-Port Ethernet Switch from Node 1…

ISS Daily Summary Report – 2/08/2017

Galley Rack Outfitting: The crew continued with Galley Rack Outfitting today. They mated power, data, and…

ISS Daily Summary Report – 2/07/2017

Japanese Experiment Module (JEM) Exposed Facility (EF) High Definition Television (HDTV) Camera Installation: Today, the crew installed…

ISS Daily Summary Report – 2/06/2017

H-II Transfer Vehicle (HTV)-6 Deorbit:  HTV-6 successfully completed all three deorbit burns over the weekend.  Loss…

ISS Daily Summary Report – 2/03/2017

Exposed Facility Unit (EFU) Adapter Transfer: Overnight ground controllers maneuvered the Japanese Experiment Module (JEM) Robotic…

ISS Daily Summary Report – 2/02/2017

Exposed Facility Unit (EFU) Adapter Transfer: Ground Controllers maneuvered the Japanese Experiment Module (JEM) Remote Manipulator…