Transition to (X2) R15 Software: As part of the R15 software transition, the Payload (PL) Multiplexer/Demultiplexers…
Author: HQ
ISS Daily Summary Report – 2/14/2017
Transition to (X2) R15 Software: As part of the R15 software transition, two of the three…
ISS Daily Summary Report – 2/13/2017
Electrostatic Levitation Furnace (ELF) Sample Clean: This morning the crew disconnected the Sample Cartridges from within…
ISS Daily Summary Report – 2/10/2017
Japanese Experiment Module (JEM) ORU Transfer Interface (JOTI) and Robotics External Leak Locator (RELL) Installation on…
ISS Daily Summary Report – 2/08/2017
Galley Rack Outfitting: Today the crew relocated the Node 1 16-Port Ethernet Switch from Node 1…
ISS Daily Summary Report – 2/08/2017
Galley Rack Outfitting: The crew continued with Galley Rack Outfitting today. They mated power, data, and…
ISS Daily Summary Report – 2/07/2017
Japanese Experiment Module (JEM) Exposed Facility (EF) High Definition Television (HDTV) Camera Installation: Today, the crew installed…
ISS Daily Summary Report – 2/06/2017
H-II Transfer Vehicle (HTV)-6 Deorbit: HTV-6 successfully completed all three deorbit burns over the weekend. Loss…
ISS Daily Summary Report – 2/03/2017
Exposed Facility Unit (EFU) Adapter Transfer: Overnight ground controllers maneuvered the Japanese Experiment Module (JEM) Robotic…
ISS Daily Summary Report – 2/02/2017
Exposed Facility Unit (EFU) Adapter Transfer: Ground Controllers maneuvered the Japanese Experiment Module (JEM) Remote Manipulator…