Payloads FLARE (Solid Combustion Assembly): The crew removed and replaced the FLARE-Solid Combustion Experiment Module (SCEM)…
Category: Station
ISS Daily Summary Report – 2/03/2021
Payloads Cell Biology Experiment Facility-L (CBEF-L): The crew connected the CBEF-L Alt power and data umbilicals…
ISS Daily Summary Report – 2/02/2021
Payloads Cell Biology Experiment Facility-L (CBEF-L): The crew connected video, power and data cables to the…
ISS Daily Summary Report – 2/01/2021
USOS Extravehicular Activity (EVA) #70 – ISS Upgrades II: EV1 Michael Hopkins and EV2 Victor Glover…
ISS Daily Summary Report – 1/29/2021
Payloads AstroRad Vest: The crew performed exercise while wearing the AstroRad Vest. The AstroRad vest is…
ISS Daily Summary Report – 1/28/2021
Payloads Capillary Structures: The crew performed the Capillary Structures Sorbent Contactor operations that demonstrates flow through…
ISS Daily Summary Report – 1/27/2021
USOS Extravehicular Activity (EVA) #69 Columbus Upgrades – Michael Hopkins (EV1) and Victor Glover (EV2) performed…
ISS Daily Summary Report – 1/26/2021
Payloads FSL (Fluid Science Laboratory): The crew removed the RUBI Multi-Scale Boiling experiment container hardware and…
ISS Daily Summary Report – 1/25/2021
Payloads CBEF-L (Cell Biology Experiment Facility-L): The crew greased the Front bolts and then replaced the…
ISS Daily Summary Report – 1/22/2021
Payloads Antimicrobial coatings: The crew touched coupons A-G (uncoated), then touched H-N, then took photos of…