Payloads CIR (Combustion Integrated Rack) Fluids and Combustion Facility: The crew set the CIR FOMA Calibration…
Category: Station
ISS Daily Summary Report – 2/24/2021
Payloads CIR (Combustion Integrated Rack) Fluids and Combustion Facility: The crew replaced the CIR FOMA Cal…
ISS Daily Summary Report – 2/23/2021
Payloads ISAAC (Integrated System for Autonomous and Adaptive Caretaking): The crew performed the Astrobee free flyer…
ISS Daily Summary Report – 2/22/2021
Payloads SABL (Space Automated Bioproduct Laboratory): The crew removed the CO2 Incubator Controller from the SABL-1…
ISS Daily Summary Report – 2/19/2021
Payloads 3DMM: The crew continued the sample collections, this time in the Node 3 area. Surfaces…
ISS Daily Summary Report – 2/18/2021
Payloads AstroRad Vest: The crew donned the AstroRad Vest and demonstrated WHC activities while another crewmember…
ISS Daily Summary Report – 2/17/2021
Payloads Confined Combustion: The crew prepare Confined Combustion samples for flame test operations and conducted tests…
ISS Daily Summary Report – 2/16/2021
Payloads Three-dimensional Microbial Mapping of ISS Environment (3DMM): The crew performed surface collections in PMM and…
ISS Daily Summary Report – 2/12/2021
Payloads 3DMM: The crew continued the 3DMM experiment by collecting samples from the Node 2 area.…
ISS Daily Summary Report – 2/11/2021
Payloads ASTRORAD Vest: In a continuation of the Astrorad series of activities, the crew donned and…