Watch the September 29 Antares Launch from Wallops

Spend a night with friends and family watching the launch of Northrop Grumman’s Antares rocket at…

ISS Daily Summary Report – 9/09/2020

Payloads Confocal Space Microscopy: The crew performed a partial Setup of the Confocal Space Microscopy in…

ISS Daily Summary Report – 9/08/2020

Payloads Confocal Space Microscopy: The crew removed optical lenses from the Confocal Space Microscope hardware. The…

ISS Daily Summary Report – 9/04/2020

Payloads Astrobee: The crew performed various localization and mobility operations for the Astrobee satellite.  This was…

ISS Daily Summary Report – 9/03/2020

Payloads NREP Hardware Remove: Following the extension of the slide table into the JEM pressurized volume…

ISS Daily Summary Report – 9/02/2020

Payloads EXPRESS Rack Relocation:  Following the relocation of EXPRESS racks 8, 10B, and 11B, the crew…

ISS Daily Summary Report – 9/01/2020

Payloads EXPRESS Rack Relocation:  The crew performed the activities necessary to relocate EXPRESS racks 8, 10B,…

ISS Daily Summary Report – 8/31/2020

Payloads JEMAL Depressurization:  The crew assisted with the depressurization of the JEM airlock (JEMAL) in preparation…

ISS Daily Summary Report – 8/28/2020

Payloads MSRR/MSL (Materials Science Laboratory) SCA exchange: The crew removed the processed calibration cartridge and inserted…

ISS Daily Summary Report – 8/27/2020

Payloads Combustion Integrated Rack/Advanced Combustion via Microgravity Experiments (CIR/ACME):  The crew performed the steps necessary to…