Payloads NanoRacks Cubesat Deployer – Mission 19 (NRCSD-19) – The crew installed the Cubesat deployers onto…
Category: Station
ISS Daily Summary Report – 10/30/2020
Payloads Cubesat review: The crew reviewed the NRCSD-19 installation material in preparation for next week’s activities.…
ISS Daily Summary Report – 10/29/2020
Payloads Drop Vibration Setup: The crew performed the necessary steps to install the Drop Vibration hardware…
ISS Daily Summary Report – 10/28/2020
Payloads Drop Vibration Gather and Review: The crew reviewed the procedures and gathered the appropriate hardware…
ISS Daily Summary Report – 10/27/2020
Payloads ExHAM sample detach: The crew removed and stowed 15 ExHAM#1 samples. The samples were exposed…
ISS Daily Summary Report – 10/26/2020
Payloads ACE (Advanced Colloids Experiment) module photos: The crew retrieved and took photos of ACE modules…
ISS Daily Summary Report – 10/23/2020
Payloads SPECTRUM Plate Remove: The crew powered off the SPECTRUM facility, opened the SPECTRUM facility access…
ISS Daily Summary Report – 10/21/2020
62Soyuz (62S) Undock/Landing: The 62S crew, Chris Cassidy, Anatoly Ivanishin and Ivan Vagner, are preparing to…
ISS Daily Summary Report – 10/20/2020
Payloads Cold Atom Lab (CAL) Science Module 2 (SM2): The crew powered off the CAL SM2…
ISS Daily Summary Report – 10/19/2020
Payloads Payload Network Attached Storage (PL NAS): In an effort to resolve issues with the PL…