ISS Daily Summary Report – 6/16/2020

Payloads Capillary Driven Microfluidics: The crew configured the Light Microscopy Module (LMM) in preparation for Microfluidics…

ISS Daily Summary Report – 6/15/2020

Payloads REDEYE:  The crew installed the RED-EYE 2 satellite onto the Japanese Module (JEM) KABOR deployer…

ISS Daily Summary Report – 6/11/2020

Payloads  Electrolysis Measurement (EM): In support of the ongoing EM experiment, the crew performed a series…

ISS Daily Summary Report – 6/10/2020

Payloads Capillary Structures:  The crew set up and performed the Infill Foam Capillary Structures experiment.  The…

ISS Daily Summary Report – 6/09/2020

Payloads Electrolysis Measurement (EM): In support of the ongoing EM experiment, the crew performed a series…

ISS Daily Summary Report – 6/08/2020

Payloads  High-Definition Television (HDTV) Camera Removal:  The crew removed the HDTV hardware from the JEM Airlock…

ISS Daily Summary Report – 6/05/2020

Payloads Electrolysis Measurement (EM): In support of the ongoing EM experiment, the crew performed a series…

ISS Daily Summary Report – 6/04/2020

Payloads Combustion Integration Rack/Advanced Combustion via Microgravity Experiments (CIR/ACME):  In support of the on-going s-Flame part…

ISS Daily Summary Report – 6/03/2020

Payloads Advanced Colloids Experiment (ACE) Module photos:  The crew took images of 4 ACE modules (ACE-T4,…

ISS Daily Summary Report – 6/02/2020

Payloads Combustion Integration Rack/Advanced Combustion via Microgravity Experiments (CIR/ACME):  In a continuation of the s-Flame part…