Payloads AstroPi: Following the successful conclusion of the ESA European AstroPi challenge, the AstroPi IR (infrared)…
Category: Station
ISS Daily Summary Report – 5/11/2020
Bone Densitometer relocate: The Bone Densitometer unit was relocated from EXPRESS rack 4 to EXPRESS rack…
ISS Daily Summary Report – 5/07/2020
Food Physiology: The crew participated in a briefing with the Food Physiology team. The Integrated Impact…
ISS Daily Summary Report – 5/06/2020
Astrobee battery charge: In preparation for the Kibo Robot Programming Challenge activities which start in the…
ISS Daily Summary Report – 5/05/2020
Payloads Wireless (Local Area Network) LAN Setup: The crew made the appropriate Wireless Adapter connection changes…
ISS Daily Summary Report – 5/04/2020
SlingShot: To prepare for the Slingshot deployer installation, the crew reviewed the big picture words, then…
NASA to Provide Coverage of SpaceX Commercial Crew Test Flight with Astronauts
NASA will provide coverage of the upcoming prelaunch and launch activities for the agency’s SpaceX Demo-2…
ISS Daily Summary Report – 5/01/2020
Combustion Integrated Rack (CIR): The crew replaced Nitrogen/Oxygen manifold bottles in support of the continuing s-Flames…
ISS Daily Summary Report – 4/30/2020
Space Fibers: The test run on GMT 118 terminated early when the fiber broke from the…
ISS Daily Summary Report – 4/29/2020
Astrobee: The crew performed the activities needed to charge 8 of the Astrobee batteries. A new…