ISS HAM pass: The crew participated in an ISS HAM pass with South Australia Wing, Parafield,…
Category: Station
ISS Daily Summary Report – 3/12/2020
Materials ISS Experiment (MISSE): The crew installed three MISSE Sample Carriers (MSCs) onto MISS Transfer Tray…
ISS Daily Summary Report – 3/11/2020
DOSIS-3D: The crew retrieved the DOSIS-3D Passive Detector Pouch (PDP) from the Dragon vehicle and installed…
ISS Daily Summary Report – 3/10/2020
Mouse Mission-5: The crew completed mouse transfer and related activities to start the mission. The purpose…
ISS Daily Summary Report – 3/09/2020
SpaceX Capture/Berthing (SpX-20): Today, the ISS crew completed robotic capture of the SpX-20 Dragon at 10:26…
ISS Daily Summary Report – 3/06/2020
CBEF-L (Cell Biology Experiment Facility-L): The crew performed a check on the Fungicide Disinfection status of…
ISS Daily Summary Report – 3/05/2020
BioFabrication Facility (BFF): The crew removed the test Cartridge from the BFF facility. The BFF is…
ISS Daily Summary Report – 3/04/2020
BioFabrication Facility (BFF): The crew placed a test cassette (without cells) into the BFF for a…
ISS Daily Summary Report – 3/03/2020
NRCSD (NanoRacks External CubeSat Deployer): The crew performed the removal of NRCD-17 CubeSat deployer from the…
ISS Daily Summary Report – 3/02/2020
DOSIS 3D (Dose Distribution Inside the ISS – 3D): The crew swapped cables inside the DOSIS…