ISS Daily Summary Report – 3/19/2020

Engineered Heart Tissue: The crew performed sample fixations on selected tissue chambers and performed cell culture…

ISS Daily Summary Report – 3/18/2020

Fluid Shifts: The crew performed activities related to the Chibis (lower body negative pressure) portion of…

ISS Daily Summary Report – 3/17/2020

Engineered Heart Tissue (EHT):  The crew performed steps to troubleshoot noise seen in the data for…

ISS Daily Summary Report – 3/16/2020

Fluid Shifts: The crew set up the appropriate hardware in the Russian segment to support the…

ISS Daily Summary Report – 3/13/2020

ISS HAM pass: The crew participated in an ISS HAM pass with South Australia Wing, Parafield,…

ISS Daily Summary Report – 3/12/2020

Materials ISS Experiment (MISSE):  The crew installed three MISSE Sample Carriers (MSCs) onto MISS Transfer Tray…

ISS Daily Summary Report – 3/11/2020

DOSIS-3D: The crew retrieved the DOSIS-3D Passive Detector Pouch (PDP) from the Dragon vehicle and installed…

ISS Daily Summary Report – 3/10/2020

Mouse Mission-5: The crew completed mouse transfer and related activities to start the mission.  The purpose…

ISS Daily Summary Report – 3/09/2020

SpaceX Capture/Berthing (SpX-20):  Today, the ISS crew completed robotic capture of the SpX-20 Dragon at 10:26…

ISS Daily Summary Report – 3/06/2020

CBEF-L (Cell Biology Experiment Facility-L):  The crew performed a check on the Fungicide Disinfection status of…