CBEF-L (Cell Biology Experiment Facility – Left) configuration change: The crew worked on steps to change…
Category: Station
ISS Daily Summary Report – 12/19/2019
Microgravity Crystals: The crew performed the procedure review, pipetted and mixed solutions of varying viscosities onto…
ISS Daily Summary Report – 12/18/2019
Cell Biology Experiment Facility (CBEF-L): The crew assisted with the check-out of the Cell Biology Experiment…
ISS Daily Summary Report – 12/17/2019
CBEF-L (Cell Biology Experiment Facility – Left): The crew installed the CBEF-L centrifuge and performed the…
ISS Daily Summary Report – 12/16/2019
Acoustic Diagnostics: The crew set up the appropriate hardware, performed the audio measurements, and used the…
ISS Daily Summary Report – 12/13/2019
Gravitational References for Sensimotor Performance: Reaching and Grasping (GRASP): The crew performed GRASP quasi-free sessions. The…
ISS Daily Summary Report – 12/12/2019
Bio-Monitor: The crew doffed and stowed the headband and Garment hardware. The crew then connected the…
ISS Daily Summary Report – 12/11/2019
Bio-Monitor: The crew swapped out the garment and stowed the old garment. Although the ISS is…
ISS Daily Summary Report – 12/10/2019
Rodent Research-19 (RR-19): The crew performed RR-19 Rodent transfers from the Dragon capsule into the Habitats.…
ISS Daily Summary Report – 12/09/2019
Rodent Research-19 (RR-19): The crew Installed four Rodent Habitats into the Express racks 1 and 2A.…