NanoRacks CubeSat Deployer (NRCSD) Installation: In preparation for the planned satellite launch on Wednesday, the crew…
Category: Station
ISS Daily Summary Report – 6/28/2019
NRCSD (NanoRacks External Cygnus CubeSat Deployer): The crew reviewed procedures for the upcoming NRCSD-16 installation currently…
ISS Daily Summary Report – 6/27/2019
Human Resources Facility (HRF) 1 Centrifuge: The crew set up and checked out the HRF1 Centrifuge…
NASA Highlights Science on 18th SpaceX Resupply Mission to Space Station
NASA will host a media teleconference at 1 p.m. EDT Tuesday, July 9, to discuss select…
ISS Daily Summary Report – 6/26/2019
Genes in Space-6: The crew stowed the Biomolecule Sequencing device which was used for the Genes…
ISS Daily Summary Report – 6/24/2019
57 Soyuz (57S) Departure: The 57S crew is scheduled to depart the ISS and return to…
ISS Daily Summary Report – 6/21/2019
Story Time From Space: A crewmember recorded a Story Time From Space session for Newton’s Law…
ISS Daily Summary Report – 6/20/2019
Fiber Optic Production (FOP): The crew performed a preform and spool exchange allowing the ground to…
ISS Daily Summary Report – 6/19/2019
Materials International Space Station Experiment-11 (MISSE-11): Robotics Ground Controllers swapped MISSE Mission Science Carrier-5 (MSC-5) and…
ISS Daily Summary Report – 6/18/2019
Vascular Echo: The crew performed Blood pressure measurement setup and performed 14 measurements in support of…