ISS Daily Summary Report – 6/21/2023

Payloads: Cardiobreath: The Bio-Monitor wearables were used prior to, after, and during a CEVIS exercise to…

ISS Daily Summary Report – 6/20/2023

Payloads: General Laboratory Active Cryogenic ISS Experiment Refrigerator (GLACIER): The Glacier trays (two), tray support structures,…

ISS Daily Summary Report – 6/19/2023

Payloads: Fluid Dynamics in Space (FLUIDICS): FLUIDICS hardware was installed and recording system troubleshooting was performed.…

ISS Daily Summary Report – 6/16/2023

ISS Reboost: Last night, the ISS performed a reboost using the Aft Progress 83P rendezvous and…

ISS Daily Summary Report – 6/15/2023

USOS Extravehicular Activity (EVA) #88 ISS Roll-Out Solar Array (IROSA) 1B Install: Today, Woody Hoburg and…

ISS Daily Summary Report – 6/14/2023

Systems: ISS Roll Out Solar Array (IROSA) 1B Extravehicular Activity (EVA) Preparation Activities: In preparation for…

ISS Daily Summary Report – 6/13/2023

Payloads: Plasma Kristall-4 (PK-4): Portable USB Hard Drives 1 and 3 were connected to PK-4. PK-4…

ISS Daily Summary Report – 6/12/2023

Payloads: Fluid Science Laboratory (FSL) Soft Matter Dynamics (SMD) – FOAM: Three samples were exchanged inside…

ISS Daily Summary Report – 6/09/2023

USOS Extravehicular Activity (EVA) #87 ISS Roll-Out Solar Array (IROSA) 1A Install: Today, Woody Hoburg and…

ISS Daily Summary Report – 6/08/2023

Payloads: Plasma Kristall-4 (PK-4): The crew configured the video monitor system and gas system valves in…