Payloads: Human Research Facility-2 (HRF-2): The HRF Boot Drive was inserted into the HRF PC2 laptop.…
Category: Station
ISS Daily Summary Report – 2/27/2023
Payloads: Human Research Facility-2 (HRF-2): The One Terabyte Hard Drives (HDDs) were removed from the HRF-2…
ISS Daily Summary Report – 2/24/2023
Payloads: Airborne Particulate Monitor (APM): The APM system was checked, and a status was provided to…
ISS Daily Summary Report – 2/23/2023
Payloads: Astrobee Maneuvering by Robotic Manipulator Hopping (Astrobatics): Astrobatics skins were installed onto the Astrobee free-fliers…
ISS Daily Summary Report – 2/22/2023
Payloads: Electrostatic Levitation Furnace (ELF): The crew continued the work to install the High-Speed Camera system…
ISS Daily Summary Report – 2/21/2023
Payloads: Mochii: The crew performed a power-cycle of the Mochii electron microscope system, and then reported…
ISS Daily Summary Report – 2/20/2023
Payloads: Echo: The Echo hardware was retrieved and deployed in the Columbus Module in preparation for…
ISS Daily Summary Report – 2/17/2023
Payloads: Actiwatch-Plus: Four Actiwatch Plus devices were connected to the HRF Payload Drawer on HRF Rack…
ISS Daily Summary Report – 2/16/2023
Payloads: Cardiobreath: Bio-Monitor wearable hardware was donned and calibrated and was worn for a two-hour session…
ISS Daily Summary Report – 2/15/2023
Payloads: Four Bed CO2 (4BCO2) Scrubber: The Acoustic Blanket was installed, and acoustic tests were performed.…