Payloads: Engineered Heart Tissue-2 (EHT-2): The crew gathered the EHT-2 tissue chambers and performed the steps…
Category: Station
ISS Daily Summary Report – 4/06/2023
Payloads: Human Research Facility Veggie Profile of Mood States (Veggie POMS): A POMS short form questionnaire…
ISS Daily Summary Report – 4/05/2023
Payloads: Manufacturing Device (ManD): The crew replaced the feedstock canister, extruder, and build platform in ManD…
ISS Daily Summary Report – 4/04/2023
Payloads: BioFabrication Facility (BFF): In order to put the tissue cassette in a good configuration, the…
ISS Daily Summary Report – 4/03/2023
Payloads: Foams and Emulsions Sampling: An experiment-1 protocol session was performed, which results in the production…
ISS Daily Summary Report – 3/30/2023
Northrup Grumman – 18 (NG-18) Cygnus Reboost: Today, the ISS successfully performed a 0.9 m/s reboost…
ISS Daily Summary Report – 3/29/2023
Payloads: BioFabrication Facility (BFF): Vials were inserted into the BFF that contained Cell Cassette 20510 in…
ISS Daily Summary Report – 3/28/2023
Payloads: Ampli Space Pharmacy: Ampli Space Pharmacy hardware was stowed. The Ampli Space Pharmacy investigation studies…
ISS Daily Summary Report – 3/27/2023
Payloads: Engineered Heart Tissues-2: A media change, sampling and assigned treatment dosing was performed on each…
ISS Daily Summary Report – 3/24/2023
Payloads: BioFabrication Facility (BFF): Tissue Cassettes were installed into BFF. Using 3D biological printers to produce…