ISS Daily Summary Report – 2/23/2023

Payloads: Astrobee Maneuvering by Robotic Manipulator Hopping (Astrobatics): Astrobatics skins were installed onto the Astrobee free-fliers…

ISS Daily Summary Report – 2/22/2023

Payloads: Electrostatic Levitation Furnace (ELF): The crew continued the work to install the High-Speed Camera system…

ISS Daily Summary Report – 2/21/2023

Payloads: Mochii: The crew performed a power-cycle of the Mochii electron microscope system, and then reported…

ISS Daily Summary Report – 2/20/2023

Payloads: Echo: The Echo hardware was retrieved and deployed in the Columbus Module in preparation for…

ISS Daily Summary Report – 2/17/2023

Payloads: Actiwatch-Plus: Four Actiwatch Plus devices were connected to the HRF Payload Drawer on HRF Rack…

ISS Daily Summary Report – 2/16/2023

Payloads: Cardiobreath: Bio-Monitor wearable hardware was donned and calibrated and was worn for a two-hour session…

ISS Daily Summary Report – 2/15/2023

Payloads: Four Bed CO2 (4BCO2) Scrubber: The Acoustic Blanket was installed, and acoustic tests were performed.…

ISS Daily Summary Report – 2/14/2023

Payloads: Actiwatch-Plus: A crewmember doffed an Actiwatch Plus unit and stowed it in the Actiwatch Plus…

ISS Daily Summary Report – 2/13/2023

Payloads: BioFabrication Facility (BFF): Test Print Without Cells Installation 1 was performed inside the BFF. Using…

ISS Daily Summary Report – 2/10/2023

Payloads: Causal Analysis of Cardiorespiratory Coupling on the ISS (Cardiobreath): After donning the Bio-Monitor sensor garment…