Payloads: JEM Water Recovery System (JWRS): The JWRS Gas Trap Module B and T-union were reconnected.…
Category: Station
ISS Daily Summary Report – 12/13/2022
Payloads: Combustion Integrated Rack (CIR): CIR Absorber Cartridge QDs (Quick Disconnects) were reconnected. The CIR includes…
ISS Daily Summary Report – 12/12/2022
Payloads: Electrostatic Levitation Furnace (ELF): The Air Gas Bottle Unit was removed and an Argon Gas…
ISS Daily Summary Report – 12/09/2022
Payloads: JEM Small Satellite Orbital Deployer-23 (J-SSOD-23): The J-SSOD-23 experiment hardware was removed from the JEM…
NASA Taps Collins Aerospace to Develop New Space Station Spacesuits
NASA has awarded a task order to Collins Aerospace to deliver a spacewalking system for potential…
ISS Daily Summary Report – 12/08/2022
Payloads: Food Physiology: A diet briefing was attended between the crew and principal investigator team in…
ISS Daily Summary Report – 12/07/2022
Payloads: Behavioral Core Measures (BCM): A BCM research session consisting of a set of 12 runs/tests…
ISS Daily Summary Report – 12/06/2022
Payloads: Biological Research In Canisters-26 (BRIC-26): BRIC-26 hardware was inserted into the BRIC-LED facility and activated…
ISS Daily Summary Report – 12/05/2022
USOS 3A ISS Roll Out Solar Array (IROSA) Install Extravehicular Activity (EVA): This past weekend on…
ISS Daily Summary Report – 12/02/2022
Payloads: JEM Small Satellite Orbital Deployer-23 (J-SSOD-23): Crewmembers observed the J-SSOD-23 deployed satellites. J-SSOD-23 CubeSat deployment…