Payloads: Electrostatic Levitation Furnace (ELF): The crew continued the work to install the High-Speed Camera system…
Category: Station
ISS Daily Summary Report – 2/21/2023
Payloads: Mochii: The crew performed a power-cycle of the Mochii electron microscope system, and then reported…
ISS Daily Summary Report – 2/20/2023
Payloads: Echo: The Echo hardware was retrieved and deployed in the Columbus Module in preparation for…
ISS Daily Summary Report – 2/17/2023
Payloads: Actiwatch-Plus: Four Actiwatch Plus devices were connected to the HRF Payload Drawer on HRF Rack…
ISS Daily Summary Report – 2/16/2023
Payloads: Cardiobreath: Bio-Monitor wearable hardware was donned and calibrated and was worn for a two-hour session…
ISS Daily Summary Report – 2/15/2023
Payloads: Four Bed CO2 (4BCO2) Scrubber: The Acoustic Blanket was installed, and acoustic tests were performed.…
ISS Daily Summary Report – 2/14/2023
Payloads: Actiwatch-Plus: A crewmember doffed an Actiwatch Plus unit and stowed it in the Actiwatch Plus…
ISS Daily Summary Report – 2/13/2023
Payloads: BioFabrication Facility (BFF): Test Print Without Cells Installation 1 was performed inside the BFF. Using…
ISS Daily Summary Report – 2/10/2023
Payloads: Causal Analysis of Cardiorespiratory Coupling on the ISS (Cardiobreath): After donning the Bio-Monitor sensor garment…
ISS Daily Summary Report – 2/09/2023
Payloads: Plasma Kristall-4 (PK-4): The PK-4 system was configured to transfer experiment data for subsequent downlink.…