ISS Daily Summary Report – 8/15/2018

Russian ExtraVehicular Activity (EVA) 45: Today Artemyev (EV1) and Prokopev (EV2) exited the Docking Compartment (DC)1…

ISS Daily Summary Report – 8/14/2018

Biological Experiment Laboratory (BioLab):  The crew installed a new BioLab Incubator Door Locking Bolt today. The…

ISS Daily Summary Report – 8/13/2018

Microbial Tracking-2 (MT-2): The crew collected saliva and blood samples for the Microbial Tracking-2 investigation. MT-2…

ISS Daily Summary Report – 8/10/2018

Japanese Small Satellite Orbital Deployer 9 (J-SSOD#9): Robotics Controllers in Tsukuba, Japan maneuvered the Japanese Experiment…

ISS Daily Summary Report – 8/09/2018

HTV-7 Rack Relocation Prep: This week the crew has been executing a series of activities in…

ISS Daily Summary Report – 8/08/2018

Japanese Experiment Module (JEM) Moderate Temperature Loop (MTL) Leak Update: Express Rack (ER)5 was isolated yesterday…

ISS Daily Summary Report – 8/07/2018

Japanese Experiment Module (JEM) Moderate Temperature Loop (MTL) Leak Update: The JEM MTL leak continues with…

ISS Daily Summary Report – 8/03/2018

SpaceX-15 Dragon Unberth and Release: Early this morning, the crew removed power connections, utility jumpers and…

ISS Daily Summary Report – 8/02/2018

Chemical Gardens: Today the crew removed the Chemical Gardens 2 ampoule kit from a Cargo Transfer…

ISS Daily Summary Report – 8/01/2018

Fluid Shifts: A 55S crewmember performed their Fluid Shifts Dilution Measurements activities today.  They collected saliva,…