Japanese Experiment Module (JEM) Moderate Temperature Loop (MTL) Leak Update: The JEM MTL leak continues with the rate of 20 mL/day. On Friday, the crew completed a visual inspection of the Gas Trap Bypass Valve in the JEM Thermal Control System (TCS)2 rack but were unable to find evidence of a leak. They also isolated …