Robotic External Leak Locator (RELL) Operations: Yesterday, Ground Controllers used the SPDM to remove the RELL…
Author: HQ
ISS Daily Summary Report – 11/29/2016
Robotic External Leak Locator (RELL) Operations: On GMT 333, upon powering up the Space Station Remote…
ISS Daily Summary Report – 11/28/2016
Device for the study of Critical Liquids and Crystallization High Temperature Insert-Reflight (DECLIC-HTI-R) Installation: Today the…
ISS Daily Summary Report – 11/25/2016
FLame EXtinguishment (FLEX)-2 Multi-user Droplet Combustion Apparatus (MDCA) Exchange: This morning, the crew was scheduled to…
ISS Daily Summary Report – 11/24/2016
Cell Biology Experiment Facility (CBEF) Centrifuge Remove and Replace (R&R): The crew was scheduled to remove…
ISS Daily Summary Report – 11/23/2016
Marrow Air Sampling: The crew performed their first Marrow air sampling collection today. A breath sample…
ISS Daily Summary Report – 11/22/2016
Waste and Hygiene Compartment (WHC) Maintenance: Ground specialists met to discuss the WHC leak that occurred…
ISS Daily Summary Report – 11/21/2016
Urine Processing Assembly (UPA) Potential Wastewater Storage Tank Assembly (WSTA) Leak: This morning an unexpected caution…