Heat Shield Milestone Complete for First Orion Mission with Crew

Technicians at NASA’s Kennedy Space Center in Florida recently finished meticulously applying more than 180 blocks…

ISS Daily Summary Report – 7/07/2020

Payloads NRCSD-18 Install to Slide Table:  In preparation for the NanoRacks Cubesat Deployer – mission 18…

Jupiter's Magnificent Swirling Clouds

A multitude of magnificent, swirling clouds in Jupiter’s dynamic North North Temperate Belt is captured in…

Ethan Burbridge, In Control of the Thermostat, On Spacecraft

Ethan Burbridge, a thermal engineer, controls the thermostat on spacecraft for NASA. Click here…

NASA Provides Update on Commercial Crew Program, Close Call Review of Boeing’s Orbital Flight Test

NASA will host a media teleconference at 2:30 p.m. EDT Tuesday, July 7, to discuss the…

PIA23955: Al Jowf, Saudi Arabia

           Target: Earth Mission:  Terra Instrument:  ASTER Image Credit: NASA/METI/AIST/Japan Space Systems, and U.S./Japan ASTER Science Team…

ISS Daily Summary Report – 7/06/2020

Payloads Fluids Integrated Rack/Light Microscopy Module (FIR/LMM)/CDM change out: As a continuation of the CDM experiment,…

Artemis Generation Students Across US to Speak with NASA Astronaut in Space

Students from across the nation will pose questions about NASA’s Artemis program to an astronaut aboard…

Upgrading the Space Station Is All in a Day's Work

NASA astronaut Robert Behnken works during the Wednesday, July 1, 2020, six-hour and one-minute spacewalk to…

ISS Daily Summary Report – 7/02/2020

Payloads Astrobee: The crew powered on both Astrobee free flier units and verified the LEDs were…