ARIANESPACE’S FIFTH ARIANE 5 OF 2009 TAKES SHAPE

Build-up has begun for the fifth Ariane 5 to be launched this year – starting with the core cryogenic stage’s erection and the mating of its initial solid propellant booster. This activity – which is taking place in the Spaceport’s Launcher Assembly Building – is in parallel with preparations for Arianespace’s August mission with the no. 4 heavy-lift vehicle, which is currently in the Final Assembly Building.