Preparations for Arianespace’s initial Ariane 5 flight of 2009 entered a new phase with the startup of final payload integration at Europe’s Spaceport. This activity began with HOT BIRD™ 10’s installation atop its adapter unit, which functions as the interface between the satellite and Ariane 5’s payload “stack.”