Extravehicular Activity (EVA) #39: Kimbrough and Pesquet opened the Joint Airlock external hatch at 5:22 am CST in order to perform US EVA #39 (Lithium Ion Battery Remove & Replace (R&R) EVA #2). The EVA installs adapter plates and relocates Channel 1A Nickel Hydride (NiH2) batteries to complete the installation of the new Lithium Ion batteries. The primary objectives for the EVA are as follows: Retrieve Adapter Plate E and F from the Express Pallet (EP) Install Adapter Plate F in Slot 6 Relocate Battery 4 to Adapter Plate F Install Adapter Plate E in Slot 4 Retrieve and Install Adapter Plate D in Slot 2 Fasten H1 Bolts on Li-Ion Batteries in Slots 1 and 5 The crew ingressed the airlock with a final Phase Elapsed Time (PET) for the EVA of 05:58 hours. In addition to the primary objectives, all get-ahead tasks were also completed as follows: Node 3 Shields Bundle #3 Temp Stow Mobile Transporter Relay Assembly (MTRA) Camera Light Pan and Tilt Assembly (CLPA) Swap Latching End Effector (LEE) A Worksite Interface Fixture (WIF) Adapter R&R S0 aft to Z1 forward (Rat’s Nest) Photo Mapping Secure Solar Array Blanket Boxes (SABB) Restraints Relocate Shields Bundle #2 to Node 3 Channel 1A batteries have been activated and are healthy. Today’s Planned Activities All activities were completed unless otherwise noted. RELAKSATSIYA. Hardware Setup. EVA COTS UHF Communication Unit (CUCU) USOS Window Shutter Close Extravehicular Activity (EVA) In-Suit Light Exercise (ISLE) Preparation ISS crew and ГОГУ (RSA Flight Control Management Team) weekly conference RELAKSATSIYA. Parameter Settings Adjustment. БД-2 Kits Inventory Audit RELAKSATSIYA. Observation RELAKSATSIYA. Closeout Ops and Hardware Removal. Extravehicular Mobility Unit (EMU) Purge Extravehicular Mobility Unit (EMU) In-Suit Light Exercise (ISLE) Prebreathe Hardware stowage for disposal in Progress 433 (DC1) and IMS updates TIMER. Battery Charge Crewlock Depress Crewlock Post Depress Crewlock Egress T2 Ethernet Check СОЖ maintenance S4 Battery R&R 1A Worksite Preparation S4 Battery R&R Battery Adapter Plates Retrieval S4 Battery R&R Battery Adapter Plate F Installation Audit of FGB interior panel latches Hardware stowage for disposal in Progress 433 (DC1) and IMS updates S4 Battery R&R 1A Battery 4 Relocate S4 Battery R&R Battery Adapter Plate E Installation TIMER. Experiment setup and initiation of video recording S4 Battery R&R Battery Adapter Plate D Retrival & Installation VIZIR. Experiment Ops. US EVA, Cleanup and Crewlock Ingress TIMER. Experiment Ops Video Termination and Cleanup EVA Get-Ahead Tasks EVA Glove Photo Setup A/L Ingress Delta file prep Crewlock Repress Extravehicular Activity (EVA) Crewlock Repress EVA PET end FLUID SHIFTS Big Picture Overview Extra Vehicular Activity (EVA) Post-EVA Activities Return to nominal comm configuration after US EVA EVA Glove Photo Downlink Photo/TV Extravehicular Activity (EVA) Camera Disassembly Photo/TV Extravehicular Activity (EVA) GoPro Downlink Completed Task List Items EVA NOD3 Shield Pack EVA Tool Config MSG-MLC Power Check SSC17 Check Ground Activities All activities were completed unless otherwise noted. Channel 1A Battery activation and checkout Untie Channel 1A and 1B Three-Day Look Ahead: Saturday, 01/14: EVA Debrief, EVA Camera Disassembly, Airlock Deconfig, EMU Recharge Sunday, 01/15: Crew Off Duty Monday, 01/16: Capillary Flow, Fluid Shifts, SPHERES Dry Run, JSSOD Satellite Deploy, Galley Power Supply, EVA Tool Stow QUICK ISS Status – Environmental Control Group: Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) On Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Operate Major Constituent Analyzer (MCA) Node 3 Idle Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Standby Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up