With an average life span of 30-40 years, the cement around geothermal production wells eventually cracks over time. Because wells with cracked cement are vulnerable to leakage, reduced strength, and corrosion, it’s important to repair them in a timely fashion. However, repairs can easily top $1.5 million dollars; the cost of new materials, excavation, installation, and halting power production adds up fast.