The testing of the Launch and Checkout System for the Global Positioning System Next-Generation Operational Control System scored high with a pass rate of 97.7 percent and is now transitioning from the Raytheon factory to Schriever Air Force Base.
The testing of the Launch and Checkout System for the Global Positioning System Next-Generation Operational Control System scored high with a pass rate of 97.7 percent and is now transitioning from the Raytheon factory to Schriever Air Force Base.