Inside a cavernous northern Utah warehouse, hydraulic engineers send water rushing down a replica of a dam built out of wood, concrete and steel—trying to pinpoint what repairs will work best at the tallest dam in the U.S for a spillway torn apart in February during heavy rains that triggered the evacuation of 200,000 people living downstream.