When the Mactaquac Dam opened in New Brunswick, Canada, in 1968, it was expected to have a service life of 100 years, but a chemical reaction occurring within the concrete used to build the dam has drastically shortened that timeline.
When the Mactaquac Dam opened in New Brunswick, Canada, in 1968, it was expected to have a service life of 100 years, but a chemical reaction occurring within the concrete used to build the dam has drastically shortened that timeline.