Marrow: Today a 51S crewmember collected breath and ambient air samples for the Marrow investigation which looks at the effect of microgravity on bone marrow. It is believed that microgravity, like long-duration bed rest on Earth, has a negative effect on the bone marrow and the blood cells that are produced in the bone marrow. Combustion Integrated Rack (CIR) Configuration for Advanced Combustion via Microgravity Experiments (ACME): The crew configured the CIR optics bench that will be used to support the ACME investigation. Due to the amount of hardware requiring installation, configuration activities took a couple of days this week to complete. The ACME investigation is a set of five independent studies of gaseous flames to be conducted in the CIR. ACME’s primary goal is to improved fuel efficiency and reduced pollutant production in practical combustion on Earth. Its secondary goal is to improve spacecraft fire prevention through innovative research focused on materials flammability. Sarcolab-3: Today a USOS subject ingressed the Muscle Atrophy Research & Exercise System (MARES) chair, located in the Columbus module, while a Russian operator collected ultrasound images of the subject’s right leg during exercise activities. This completed the third and final day of the ankle configuration exercises, which were performed by three different USOS and Russian crewmembers. Later today, the MARES hardware was re-configured to support tomorrow’s knee configuration exercises. The data collected for Sarcolab-3 will be compared to pre and post-flight measurements to assess the impact of hypothesized microgravity induced muscle loss. Myotendinous and Neuromuscular Adaptation to Long-term Spaceflight (Sarcolab) investigates the adaptation and deterioration of the soleus (calf muscle) where it joins the Achilles tendon, which links it to the heel and carries loads from the entire body. Muscle fiber samples are taken from crew members before and after flight, and analyzed for changes in structural and chemical properties. MRI and ultrasound tests and electrode stimulation are conducted to help assess muscle and tendon changes caused by microgravity exposure. Multi-Omics-Mouse Consolidation: Following the successful completion and return of the Multi-Omics investigation last week, the crew completed item consolidation tasks and returned the Cell Biology Experiment Facility (CBEF) back to its nominal configuration. EVA Preparation: In preparation for the upcoming EVAs, the crew completed Enhanced Caution and Warning System (EWCS) training and EMU battery charging. S-Band String 2 Troubleshooting: Yesterday, the ground team swapped S-Band string 1 to string 2 to gain confidence in its performance. On August 6, 2017, String 2 S-Band/UHF Audio Interface (AUAI)-1P showed intermittent functionality after an AUAI Passive Built-In Test (PBIT) fault indication. Space to Ground (S/G) audio on channels 1 and 2 became unusable. Functionality was recovered by switching to S-band string 1. Since the event, multiple attempts to duplicate the signature have been unsuccessful. The plan is to remain on string 2 until the schedule USOS EVAs in early October. Today’s Planned Activities All activities were completed unless otherwise noted. ESA-PAO-RAI PRIX ASI Biomission script recording In Situ message recording PERSEO message recording ESA-PAO-CORRIERE Virtual Reality Training (VRT) Extravehicular Activity (EVA) Simplified Aid for EVA Rescue (SAFER) Extravehicular Activity Mobility Unit (EMU) Enhanced Caution and Warning System (ECWS) On-Board Training ESA-PAO-GUGGENHEIM IMS Delta file prep Handover of Increment 53 Crew Preparation of Reports for Roscosmos web site and social media Vacuum cleaning ventilation grille on FGB interior panels (201, 301, 401) ECON-M. Observation and photography Multi-Omics-Mouse Item Consolidation ISS Crew Orientation Cell Biology Experiment Facility (CBEF) Backup Power Retrieve Public Affairs Office (PAO) High Definition (HD) Config JEM Setup Crew Prep for PAO Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis Combustion Integrated Rack Hardware Gather TV conference with the participants of the Space Lesson Environmental Health System (EHS) Grab Sample Container (GSC) Sampling Operations MARES Ankle Shaving Preparation COSMOCARD. Closeout Ops Marrow Breath And Ambient Air Sample Setup – Subject SARCOLAB (MARES) Ultrasound 2 Powerup MARES Ultrasound session FGB Gas Analyzer Vacuum Cleaning XF305 Camcorder Setup СОЖ maintenance Electrostatic Levitation Furnace(ELF) Power Cable Connection Ultrasound 2 Guided Data Export Columbus Video Camera Assembly 2 Adjustment MARES subject electrodes equipment Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain Verification of ИП-1 Flow Sensor Position CALCIUM. Experiment Session 4 Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain Part 2 Public Affairs Office (PAO) Event in High Definition (HD) – Lab Adjustment of БД-2 passive mode SW ratio Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill [ABORTED] Environmental Health System (EHS) – Coliform Water Sample Analysis 44 +/- 4 hours post processing Crew Medical Officer (CMO) On Board Training (OBT) Combustion Integrated Rack Rack Doors Open Combustion Integrated Rack Optics Bench Configuration 2 for ACME Crew time for ISS adaptation and orientation Human Research Facility Ultrasound 2 power off and stowage MARES Power On and Battery Charge MARES knee configuration installation Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Fill Part 3 Extravehicular Mobility Unit (EMU) Long Life Battery (LLB) Terminate Battery Stowage Assembly (BSA) Operation Initiation MARES Battery Charge control Combustion Integrated Rack Optics Bench Translation In On-board Training (OBT) ISS Emergency Hardware Familiarization Combustion Integrated Rack Rack Doors Close MARES Knee configuration fit check Integrated Emergency Procedure Review EPM Laptop relocation for files downlink preparation CONTENT. Experiment Ops Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Sample Data Record EPM Laptop relocation to MARES Completed Task List Activities HMS CCPK Cleanup 52S Unpack Activities Ground Activities All activities were completed unless otherwise noted. Standard commanding Three-Day Look Ahead: Thursday, 09/21: Sarcolab, Mouse Habitat Closeout, Rodent Research 9 Audit, EVA Prep, BEAM Ops, Node 3 IMV Fan Cleaning Friday, 09/22: Sarcolab, ELF Sample Refill, Advanced NanoStep, FIR Troubleshooting Saturday, 09/23: Housekeeping, Crew Off-Duty QUICK ISS Status – Environmental Control Group: Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) On Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 […]