RS-25 flight engine E2063 is delivered and lifted into place onto the A-1 Test Stand at Stennis Space Center on Sept. 27 in preparation for an Oct. 19 hotfire test.
RS-25 flight engine E2063 is delivered and lifted into place onto the A-1 Test Stand at Stennis Space Center on Sept. 27 in preparation for an Oct. 19 hotfire test.