67 Progress (67P) Undock: This evening, 67P is scheduled to undock from the Service Module (SM) aft port at 7:03 PM CST. Arthrospira-B (Batch Culture) Assembly: Four Arthrospira experiment containers were removed from the Biolab Incubator to exchange the reservoirs inside the Biolab. Following the exchange of the reservoirs, the ECs were reinstalled back onto … Continue reading “ISS Daily Summary Report – 12/27/2017”