Human Research Facility (HRF)-2: This morning the crew connected a 5 meter USB cable and an 8 port serial adapter and spider cable between the HRF-2 and HRF-1 racks in order to support troubleshooting of the Rack Interface Controller (RIC) on HRF-2. Ground teams are evaluating the troubleshooting results. On Sunday, March 25th, approximately one … Continue reading “ISS Daily Summary Report – 3/30/2018”