ISS Daily Summary Report – 4/24/2018

Human Research Facility-2 (HRF-2) B-Rack Interface Controller Install: Today the crew installed the new BRIC into the HRF-2 rack to resolve Rack Interface Controller (RIC) issues that started back on March 25th. Following the installation, the ground attempted activation but was not able to establish communication with the High Rate Link Card (HRLC) within the … Continue reading “ISS Daily Summary Report – 4/24/2018”