Lab Carbon Dioxide Removal Assembly (CDRA) Shut down: Yesterday afternoon the Lab CDRA shut down due to an Air Selector Valve (ASV) fault on valve 104. Initial recovery attempts, and subsequent troubleshooting, were unsuccessful. Node 3 CDRA is active and Amine Swingbed was also activated, in order to better manage ppCO2 over the weekend. Teams …