Technicians at NASA’s Kennedy Space Center in Florida today will place space shuttle Discovery on the specialized transporter that will ferry it across the street from Orbiter Processing Facility-3 to the Vehicle Assembly Building. That move is slated for Sept. 8. The winged spaceship has spent the last several month being prepped for spaceflight. At the VAB, the orbiter will be joined to the external fuel tank and solid rocket boosters for launch. Liftoff is targeted for Nov. 1 at 4:40 p.m. Eastern time on STS-133.
At NASA’s Johnson Space Center in Houston, the STS-133 astronauts will conduct a deorbit preparation simulation today.