Commercial operation of the CHASNUPP-1 996 megawatt intermediate type pressurised water reactor began in May 2000 in Pakistan. It is a conventional two-loop PWR and is run by the Pakistan Atomic Energy Commission. Now, scientists Khurram Mehboob and Mohammad Aljohani of the Department of Nuclear Engineering at King Abdul Aziz University in Saudi Arabia have carried out simulations of the activity of the unit using MATLAB to probe the risks associated with a putative coolant leak that might see radioactivity entering the environment. The team reports details of their study in the International Journal of Nuclear Energy Science and Technology.