Preparing for Flight

In preparation for its last planned mission to the International Space Station, shuttle Discovery was lowered onto its external fuel tank and solid rocket boosters in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. The lift and mate operation began Sept. 9 and wrapped up early Sept. 10. On Sept. 21, 2010, Discovery completed its last planned trip to the launch pad at 1:49 a.m., leaving the Vehicle Assembly Building at about 7:23 p.m. on the slow, 3.4-mile crawl to the pad. Discovery, the oldest of NASA’s three active orbiters, first launched Aug. 30, 1984, on STS-41D and is being readied for the STS-133 mission to station. Liftoff is targeted for Nov. 1 at 4:40 p.m. EDT. Image Credit: NASA/Jack Pfaller