SMART-1 mission to the Moon ready for launch

The launch campaign for Arianespace Flight 162 has resumed, with a September 27 liftoff date now set for the upcoming mission that will carry three satellite payloads.

Activity resumed at the Spaceport in French Guiana on September 17 following a delay that resulted from a payload customer’s request to conduct additional verifications on its satellite.

Flight 162 will carry the European Space Agency’s SMART-1 space probe, Eutelsat’s e-BIRD broadband services spacecraft and the Indian INSAT-3E telecom/video broadcast satellite.

For the latest information and photos on preparation for Arianespace Flight 162, see the Arianespace Web site:
http://www.arianespace.com

Read more about ESA’s SMART-1 mission to the Moon:

http://www.esa.int/SPECIALS/SMART-1/SEMYJ90P4HD_0.html