Seal Replacement Work Begins on Discovery

Technicians now are replacing two seals where there previously was a small hypergolic fuel leak at Discovery’s right-hand crossfeed line flange.

Propellants from the four orbital maneuvering and reaction control system tanks and the crossfeed have been drained. Crews will disconnect the right-hand fuel crossfeed flange, perform an inspection and replace the primary and secondary seals.‬‪

The seal replacement is expected to be completed tonight. The work should not impact the targeted launch date on Nov. 1.‬‪‬‪